Name of the Project Road Road section / Bridge No) |
Project Type |
Location |
Length of the Road (km) / Bridge (m) |
Commencement Date |
Target Completion Date |
Description |
Progress as at 30.06.2020 |
Remarks |
Improvements to Central Expressway Connectivity Roads in Kandy and its suburbs |
Foreign Aid Loan |
|
|
|
|
Procurement of Consultant for feasibility study |
- |
|
Preparation of Social and Environment Impact Assessment Report |
- |
|
Preparation of Detailed Project Report |
- |
|
Short Term Requirement |
|
1) Rehabilitation & Improvements of Katugastota - Madawala (B205) Road, section (ch 0+000 - 6+250 km) & Madawala - Digana (B 256) Road, section (ch 0+000 - 8+100 km) to (02) Two Lane Standard using Performance Based Road Contracting Method |
14.35 |
i) Topographical Survey |
100% |
|
ii) Preliminary Geometrical Design |
100% |
|
iii) Preparation of Acquisition Plan |
100% |
|
iv) Land Acquisition |
- |
|
2) Construction of a parallel tunnel to the existing Mahiyawa tunnel on Kandy - Jaffna (A009) Road |
|
i) Topographical Survey |
100% |
|
ii) Preliminary Geometrical Design |
100% |
|
iii) Preparation of Acquisition Plan |
- |
|
iv) Land Acquisition |
- |
|
Long Term Requirement |
|
|
1) Widening & Improvements of section of Katugasthota - Kurunegal - Puttalam (A010) Road from Katugasthota to Galagedara (from ch. 0+300 km to ch. 13+500 km) |
13.2 |
i) Topographical Survey |
100% |
|
ii) Preliminary Geometrical Design |
60% |
|
iii) Preparation of Acquisition Plan |
|
|
|
|
iv) Land Acquisition |
|
|
2) Construction of By - pass Road at Katugasthota Town connecting A009 & A010 Roads (new road) |
0.55 |
i) Topographical Survey |
100% |
|
ii) Preliminary Geometrical Design |
75% |
|
iii) Preparation of Acquisition Plan |
50% |
|
iv) Land Acquisition |
1% |
|
3) Widening & Improvements of Aladeniya - Eriyagama (from ch. 0+ 000 km) (B 005) Road |
10 |
i) Topographical Survey |
100% |
|
iii) Preparation of Acquisition Plan |
|
|
iv) Land Acquisition |
|
|
4) Widening and Improvements of Barigama - Haloluwa (B 537 ) Road (from ch.0 + 000 km to ch. 5 + 760 km) |
5.76 |
i) Topographical Survey |
|
|
100% |
|
ii) Preliminary Geometrical Design |
|
|
75% |
|
iii) Preparation of Acquisition Plan |
|
|
|
|
iv) Land Acquisition |
|
|
5) Widening and Improvements of Ambatenna - Bokkawala - Arabekade (B015) Road 2.50 km |
2.5 |
i) Topographical Survey |
|
|
|
|
ii) Preliminary Geometrical Design |
|
|
|
|
iii) Preparation of Acquisition Plan |
|
|
|
|
iv) Land Acquisition |
|
|
6) Widening and Improvements of Alawathugoda - Pujapitiya (B377) Road from ch. 0 + 000 km to ch. 7 + 500 km & B204 from ch. 7+ 500 km to ch. 8 + 100 km) |
8.1 |
i) Topographical Survey |
|
|
ii) Preliminary Geometrical Design |
|
|
|
|
iii) Preparation of Acquisition Plan |
|
|
|
|
iv) Land Acquisition |
|
|