line decor
line decor
   
 
  < Back
Southern Expressway
 
Southern Expressway from Pinnaduwa (Galle) to Godagama (Matara)
 
 

The section of Southern Expressway from Pinnaduwa (Galle) to Godagama (Matara) has been opened to public on 15th March 2014. The section from Kottawa to Pinnaduwa (Galle) was completed in November 2011 and is in operation at present.

Galle–Matara section of Southern Expressway has two intersections in between Pinnaduwa & Godagama interchanges; namely, Imaduwa interchange & Kokmaduwa interchange. This section also consists of 4-lane capacity similar to the earlier section from Kottawa to Pinnaduwa. The maximum operating speed for this section is also 100 kmph. It is expected to extend the Southern Expressway from Matara to Hambantota with the intention of linking Mattala Airport and Hambantota Harbour to the Commercial Capital, Colombo in future.

 

Videos and User Guide
If you are having problems viewing the Sinhala text, PDF files or videos in this page, please download relevant software.
siyabas
       
The information regarding the correct use of the expressway is provided below for your reference.      
   
   Advice on safe use of the Southern Expressway - Video Clips
Click to View the video
1. Vehicles which are allowed and not allowed to enter the Expressway
click
2. Entering the Expressway
sinhala_complete
3. Safe use of the Expressway
click
4. Using Lanes...
sinhala_complete
5. Exit from the Expressway
click
6. Actions to be taken in the event of vehicle breakdown
click
7. Actions to be taken in the event of an accident
sinhala_complete
top  
User Guide - Sinhala (Complete document)
sinhala_complete
User Guide - English (Complete document)
english
User Guide - Tamil (Complete document)
tamil
       
User Guide - Sinhala
Sinhala
01. Introduction
      හැඳින්වීම
02. Map
      මාර්ග සිතියම
map
03. Entree points to the Expressway
     මාර්ගයට පිවිසිය හැකි ස්ථාන
   Interchanges
      අන්තර් හුවමාරු
  • Kottawa (Colombo - Ratnapura - Wellawaya - Batticaloa Road - A004)
    කොට්ටාව
entree_points
  • Kahatuduwa (Colombo - Horana Road - B084)
    කහතුඩුව
entree_points
  • Gelanigama (Panadura - Nambapana - Ratnapura Road - A008)
    ගැලනිගම
entree_points
  • Dodangoda (Nagoda - Kalawellawa - Bellapitiya Road - B304)
    දොඩන්ගොඩ
entree_points
  • Welipanna (Horana - Anguruwatota - Aluthgama Road - B157)
    වැලිපැන්න
entree_points
  • Kurundugahetekma (Ambalangoda - Elpitiya - Pitigala Road - B014)
    කුරුඳුගහහැතැක්ම
entree_points
  • Baddegama (Hikkaduwa - Baddegama - Nilhena Road - B153)
    බද්දෙගම
entree_points
  • Pinnaduwa (Galle - Udugama Road - B129)
    පින්නදූව
entree_points
04. Vehicles which are allowed and not allowed to enter the Expressway
      අධිවේගී මාර්ගයට පිවිසීමට අවසර දෙන හා නොදෙන වාහන
entree_points
05 - 09. User fee payment methodology
      ගාස්තු ගෙවීමේ පිළිවෙල හා එක් එක් වර්ගයට අයත් වාහන සඳහා ගෙවිය යුතු ගාස්තු
entree_points
10 - 14. Instructions to use the expressway
      අධිවේගී මාර්ගය භාවිතය සඳහා උපදෙස්
entree_points
15. Hospitals which are located nearest to the interchanges
      අන්තර් හුවමාරු වල සිට කඩිනමින් ලගා විය හැකි රෝහල්
entree_points
16. Police Stations which are located nearest to the interchanges
      අන්තර් හුවමාරු වලට ආසන්න පොලිස් ස්ථානවල තොරතුරු
entree_points
17. Facilities available in Service Areas
      සේවා පෙදෙස තුල ලැබිය හැකි පහසුකම්
entree_points
18. Distance between Interchanges
      දක්ෂිණ අධිවේගී මාර්ගයේ එක් එක් අන්තර් හුවමාරු අතර ඇති දුර
entree_points
19. The way of entering the Expressway from Galle and from Matara
      මාතර හා ගාල්ල සිට අධිවේගී මාර්ගයට පිවිසෙන අයුරු
entree_points
20. The way of entering the Expressway from Kaduwela, Peliyagoda and from cities near to Colombo
      කඩුවෙල, පෑලියගොඩ හා ආසන්න නගරවල සිට අධිවේගී මාර්ගයට පිවිසෙන ආකාරය
entree_points
Top
Background

Southern Expressway is the first expressway in Sri Lanka and it is an important link of the proposed expressway network. It travers from Kottawa to Matara (126 km) and the construction of the section from Kottawa to Pinnaduwa (Galle) has been completed as a dual Expressway with 4-lane facility. Galle Port access road has been built to connect Galle city to Pinnaduwa interchange.

Asian Development Bank (ADB) and Japan Bank for International Corporation (JBIC) are the main funding agencies for this project. The section from Kottawa to Kurundugahahetekma (65km) was constructed under the financial assistance of JBIC and the section from Kurundugahahetekma to Pinnaduwa (Galle), 29.3km was constructed under the financial assistance of ADB. The section from Pinnaduwa (Galle) to Godagama which is about 35km has been agreed to be financed by the Export and Import Bank of China.

The design speed of the Expressway is 120km/h. The operation speed of the Expressway is 100km/h.

The Southern Expressway will be extended up to Hambantota connecting Mattala Airport which is being constructed.

Project Objectives

  • Improve transport facilities for future development of Southern Region. 
  •  
  • Provide a highway to act as a catalyst in encouraging and attracting industries and services for the Economic and Social development of the region.
  •  
  • To promote inter-regional transport facilities by developing this road, considering it as a major component of the proposed Expressway network.
 
Current Travel Time
Expected Travel Time on Expressway
Colombo - Matara
4 1/2 - 5 hrs
2 hrs
Kottawa - Pinnaduwa (Galle)
3 1/2 - 4 hrs
1 hr

Top

Click on the image to get a large view

Benefits of the Project  
  • Reduce travel time between Colombo to Matara.
  • Reduce traffic congestion on Colombo-Matara Road, and reduce delay costs, fuel costs there by contributing to national economy.
  • Attract private sector investors and there by contributing to expand the job market
  • Development of fisheries, agriculture, industries in the region .
  • Expand tourism presently confined to the coastal belt, along Colombo-Galle-Matara.
  • Development of Galle port.
  • Development of the towns belong to 11 interchanges as Economic Centers
  • Enhance the value of land and property in the region

Top

Kottawa to Pinnaduwa Opening
Sri Lanka’s first ever access controlled expressway from Kottawa to Pinnaduwa (Galle) was ceremonially opened by His Excellency the President Mahinda Rajapakse on 27th of November 2011. The length of this section is 96km and newly constructed Galle Port access road of length 5km will connect this Expressway to the Galle city. The expected travel time from Kottawa to Pinnaduwa (Galle) when this expressway is used about one hour.

The section from Galle to Matara of length 35km is under construction and scheduled to be completed by 2013. There are plans to extend the Southern Expressway up to Hambantota connecting Mattala International Airport which is being constructed.  The length of this section will be 75km and surveys are being done to acquire land for this section of the Expressway.
pic2  
Click to see more photographs >>
     
Project photographs:    
During Construction    
Kottawa end during construction
Part of Kahatuduwa interchange, duringconstruction
     
After Completion    
Benthara Bridge - Longest Bridge in Sri Lanka
Construction work
Ambalangoda exit at Kurundugahahethekma interchange
     
Completed Project
Completed Project
Galle exit at Pinnaduwa interchange
     
Top    
 
 
Last Modified Date : 28-Mar-2014 1:39 PM